Crew Accommodation Over Winter and Christmas
How to plan crew accommodation through winter works and the Christmas shutdown: whether to keep the house, how to handle the January restart, and what makes a house work in the cold.
Winter brings two accommodation problems at once. Work carries on through the cold, wet and dark, which puts more strain on the house. Then the Christmas shutdown arrives and you have to decide what to do with the beds you have booked. This guide covers both.
Part one: winter works
Heating that keeps up
A house that is fine in September can feel very different in January. Check the heating works properly and that it is included in the price. With us, bills and Wi-Fi are in one weekly price, so the crew can keep the heating on without anyone worrying about a meter.
Somewhere to dry kit
Wet coats, boots and hi-vis need to be dry by the morning. Laundry facilities in the house help, and so does space to hang wet gear overnight. Ask about it before you book, especially for crews working outdoors.
Parking in bad weather
Short daylight and icy mornings make parking matter more. A van that has to be dug out of a tight on-street space, or reversed down a steep drive in the dark, is a risk. With us, van parking is confirmed on every quote, sized to the vehicles you are bringing.
Drive times in winter
The drive to site at 6am in December is not the drive you checked in summer. Allow for fog, flooding and slower traffic, and favour houses with a straightforward run to site or to the park and ride.
Sleep and welfare
Long dark evenings on a winter job are easier in a house with a lounge, a kitchen and a bed each than in a single hotel room. Our houses are fully furnished, with fully equipped kitchens, and single beds are available.
Part two: the Christmas shutdown
Most large sites stop for a period over Christmas and New Year. The exact dates vary by project and contractor, so get them confirmed early.
Keep the house or release it?
There are two options, and both have a cost.
- Keep the house over the break. The crew can leave tools and kit, come back to the same rooms and start on the first day back without a search. You pay for the nights the house is empty.
- End the stay and restart in January. You stop paying over the break, but you need to book again, and the same house may not be free when you return.
Which makes sense depends on how long the shutdown is, how long the job has left and how tight housing is near site. Ask for the price of both before you decide. With us you can extend or shorten a stay, so tell us your shutdown dates as early as you can.
Book January early
Many crews remobilise in the same week in January. Around big projects, that week can be one of the hardest times to find beds at short notice. If you know you are coming back, book January early, even if headcount is not final. You can swap workers mid-stay once you know who is coming.
Tools and vans over the break
Do not assume tools can stay in an empty house or a parked van for two weeks. Agree with the crew what goes home, what stays and who is responsible for it.
Check-out before the break
If you are ending the stay, agree the check-out day, what happens with keys and any final clean. Make sure the last invoice covers the right dates.
Travel home for Christmas
The last working day before the break is often a Friday rush to get home. If the crew is travelling a long way, think about whether they finish a day earlier, or check out the morning after the last shift rather than driving straight off a long day. A tired driver on a busy motorway in December is not worth the saved night.
Paperwork across the year end
Many firms close the year or the quarter around Christmas. If the booking crosses into January, check whether accounts need a new purchase order for the new period. Company invoicing and purchase orders are welcome, and every booking comes with a VAT invoice.
A winter and shutdown checklist
- Confirm the shutdown dates with the principal contractor.
- Decide whether to keep or release the house, after pricing both.
- Book January beds early.
- Check heating, drying space and parking for winter conditions.
- Agree what happens to tools and vans over the break.
- Sort the purchase order for the new year.
For a full list of what to check on any booking, see our contractor digs checklist.
Frequently asked questions
Should I keep crew accommodation over the Christmas shutdown?
It depends on the length of the break, how long the job has left and how hard it is to find housing near site. Keeping the house means paying for empty nights. Releasing it means rebooking in January, possibly somewhere else. Ask for the cost of both.
When should I book accommodation for a January restart?
As early as you can. Many crews come back in the same week, which makes beds near big projects hard to find at short notice.
Can I change the crew when we come back in January?
Yes. With us you can extend, shorten or swap workers mid-stay.
Is heating included in the price?
With us, bills and Wi-Fi are included in one weekly price.
Plan your winter now
Tell us your shutdown and restart dates through our quote form and we will help you plan the beds either side, or call 0800 088 4225. A real person reviews every request.
Need beds for a crew?
Send the site postcode, dates and headcount. A real person reviews every request and we reply the same day.